I'm in the middle in the construction of three tigers.
The tubs I make of bonded aluminum with my own suspension and chain tensioner. The drive consists of two brushless motors, each with 450W maximum power to the inertia I use to get so very true original driving performance. The gear with a functional outdoor gear are adapted to the performance and also designed by me.
Because all three tanks in various stages of construction now I show my building report from this state, and hold him so on.
Now the first of the three tubs comes to driving.
But before that, the drive must be completed.
The countershaft are ready ready for assembly.

This I fill completely before screwing the lid with Grafithfett.

And then came the tedious but adjusting the sprockets. In the following two tigers then it goes much faster.
Here you can well recognize the space, how close they run past the right arm especially.

And here now the chain track.

And mounted with chain.

And of course I've also done a test drive in the garden.

http://www.youtube.com/watch?v=ywtFiDmn ... e=youtu.be
The suspension is still too high and is not even broken in and tuned, but the trip went without failures and lost parts