Finally it works so that I can accept it .......
But first, how to proceed.
This time I have no sprue and vents built into the form , I would like to fill the mold in an injection .
Therefore, I now still need a filling and venting in the mold. This I am simply by i install in the appropriate places with the narrowest rivers jewels form a hole with a 3mm drill bit. With a sharp drill rotates very high it works wonderfully .
Add the powdered form I put back the 3mm brass rods, which I do I need as a placeholder in the form of the bearing tubes of the chain pins .
Here you can also recognizable that my forms from time to time also be better and more accurate.
And I can now press the preheated in the syringe and slowly vented resin into the mold. Here I swing the on-edge shape slightly so that there are no air bubbles can collect in corners.
I press the resin into the mold without stopping until no air bases with the resin from the mold exit .. The syringe daf while in no case be drawn from the injection port , otherwise you again inflated a bubble of air into the system.
After the resin was hard now see the link like this.
I still have a few bubbles , but only on the bearing surface of the chain link and I certainly still get away .
And so the raw plastered link then looks . The few bubbles I can now easily repaired with a spatula and then the link is now usable.